The Ampaura VAST series, certified for NSW PDRS BESS4, and German-built RCT Power RCTerra systems, certified for BESS5, delivered with the energy management system that makes them perform.
Ampaura Australia has partnered with RCT Power. The platform is engineered in Konstanz, Germany, manufactured globally, and supplied, commissioned and supported from Adelaide. Spec sheets are right here on the page, industry standard, no forms. Want drawings, warranty terms and compatibility notes as well? Request the full spec pack below.

All-in-one cabinet: battery, inverter and controls, outdoor rated, installed in days.

Outdoor cabinet with liquid-cooled LFP packs and backup switching within 50 ms.
RCTerra Class 1.0 233
The latest 314 Ah cell platform with three-stage fire protection down to cell level.
RCTerra Class 2.0 261
Ten-foot format for sites with real load. Also available as a 783 kWh build.
RCTerra Pro 2.0 1044
Twenty-foot containerised DC block for heavy industrial and utility-scale projects.
RCTerra Max 1.0Send us an interval-data file and we will size it properly, no guesswork. Modelled in Ampaura Designer against your tariff and load.
Get it sized for your siteThe batteries in the news are not the batteries on your wall. Commercial storage uses a different chemistry, built for a different job, and your insurer will ask about exactly this.
Lithium iron phosphate, the safest mainstream battery chemistry: low fire risk, thermally stable, and rated for 6,000 to 8,000 cycles depending on platform, which is 16 to 22 years of daily work. The e-scooter cells that make headlines are a different chemistry entirely.
Liquid cooling on the RCTerra range keeps every cell at its ideal temperature through a 45 degree January, which is what protects performance and lifespan.
Suppression technology throughout the cabinet and rock wool isolation between modules, engineered in at the factory, not bolted on later.
Ampaura Australia partners with RCT Power, the German storage engineer whose batteries lead independent efficiency testing in Europe. This is where your system comes from: not a rebadged commodity cell, a purpose-built storage factory. Watch it work.
Footage and film: RCT Power production facilities and corporate story. Batteries German-built by RCT Power; supplied, supported and run from Adelaide by Ampaura Australia.
Already proven in Australia: IKEA Sydney runs a 1.17 MWh RCT system, and RCT technology sits inside grid-scale projects from Torrens Island in South Australia (1.2 GWh) to New South Wales (920 MWh). Those grid-scale projects were delivered by others, not by Ampaura.
Every system ships with the EMS that controls it, reports on it in language a CFO can read, and keeps finding savings after handover.
See Connect →The control hardware tying battery, solar, meter and cloud together. Industrial-grade, and the reason the whole system can be managed as one.
Ampaura VAST is certified for BESS4. The RCTerra range is certified for BESS5. We publish the paperwork rather than asking you to take our word for it. Certificates come with the spec pack.
What your site qualifies for →Our team works with EPCs and installers around the country. We provide support in the design phase, delivery and all the way through to the after sales support.
Full warranty terms are stated plainly in the spec pack, backed by RCT Power engineering and administered here, not through a mailbox overseas.
After-sales is the product too. A phone call to Adelaide reaches a person who knows your system, for its whole life.
Designer, Gateway, Connect and the AI that runs them, from proposal to verified value. Eleven pages, no fluff.
Full specifications, warranty terms, certification documents and delivery lead times for the RCTerra range, straight to your inbox. Useful for you, and written to hand straight to your engineer or insurer.